top of page
Cat A + B
Workplace
Cat A + B Workplace
Location: London
Size: 20,600 sq ft
Date: 2023

BJD were appointed by the contractor to create a Cat A and B turnkey D&B design for this 6-storey building at London Bridge.

The works included new windows and exterior cladding, new ground floor reception and lifts to the 5 levels of turnkey workplace

accomodation, new end of trip facilities in the basement, and new outdoor seating area for the ground floor F&B space.

Cat A + B
Finishes.png
03 RECEPTION CAM 01.jpg
FLOOR 05 CAM RECEPTION.jpg
03 FLOOR 05 CAM OFFICE.jpg
05 STAIRCASE CAM 03.jpg
01 TOILET - CAM 02.jpg
01 TOILET - CAM 01.jpg
04 BASEMENT CAM 01.jpg
04 BASEMENT CAM 02.jpg
03 FLOOR 05 CAM 01.jpg
03 FLOOR 05 CAM 02.jpg
03 FLOOR 05 CAM 03 (AXO).jpg
03 FLOOR 05 CAM 01 (WHITE OPTION).jpg
03 FLOOR 05 CAM 02 (WHITE OPTION).jpg
bottom of page